How Long Does it Take to Build a Custom Home in Sacramento?
Here’s the truth: custom home building isn’t for the impatient. If you’re looking for a quick move-in, a production home might be the way to go. But if you want a home that’s tailored to your lifestyle, your design preferences, and your long-term vision, then a custom build is worth the wait.
How long does it take to build a custom home? The answer isn’t one-size-fits-all. It depends on so many factors, so we’re here today to break it all down. H&H Builds has spent years perfecting the custom home-building process for Sacramento homeowners. Our expertise in project management, local permitting, and high-end craftsmanship means we can navigate challenges efficiently so your home is built on time and exactly how you envisioned it.
Factors That Impact the Home Building Timeline
Building a custom home in Sacramento is an exciting process, but the timeline can vary based on several factors. While some aspects are predictable, others can add unexpected time to the schedule. Understanding these key factors will help you plan for a smooth construction process.
Size and Complexity of the Home
A larger home with custom architectural details naturally takes longer to build. A simple, single-story home may progress quickly, while a multi-story home with intricate design features, custom millwork, and high-end finishes can extend the timeline. The more complex the design, the more time is needed for framing, plumbing, electrical work, and finishing touches.
Permits and Approvals
Before construction begins, the project must go through the permitting process. In Sacramento, this involves submitting plans to the city for approval, which can take anywhere from a few weeks to several months. Factors like zoning laws, environmental considerations, and structural requirements can impact how long it takes to receive permits. Working with a builder experienced in local regulations can help streamline this step.
Site Preparation and Conditions
The condition of the land plays a major role in how quickly construction can begin. The process moves faster if the lot is cleared and graded with access to utilities. However, if extensive grading, tree removal, or utility installation is required, these steps can add weeks or even months to the timeline. Soil conditions, drainage issues, and existing structures that need demolition can also slow things down.
Material and Labor Availability
Construction timelines can be affected by supply chain disruptions and labor shortages. High-demand materials like custom cabinetry, specialty tile, and high-end appliances may have long lead times. The availability of skilled tradespeople, including electricians, plumbers, and framers, can also impact the pace of construction. Planning material selections early and working with a well-connected builder can help avoid unnecessary delays.
Custom Features and High-End Finishes
A fully custom home often includes unique design elements that require specialized craftsmanship. Features like custom-built cabinetry, hand-laid stonework, smart home technology, or intricate trim details can extend the timeline. Unlike mass-produced homes with standard materials, these customizations take additional time for design, fabrication, and installation.
What is the Average Time It Takes to Build a Custom Home?
While the exact timeline for building a house in California depends on the home's size, complexity, and various external factors, most custom home builds take between 12 to 24 months from start to finish.
Custom Homes vs. Production Homes
Custom homes take notably longer than production or spec homes, which are often built first and sold later. Understanding the custom home building process will help you appreciate the level of collaboration and care that contributes to this timeline discrepancy.
- Production Homes (6–9 months): Built from pre-designed plans in large developments, these homes follow a set process with minimal customization.
- Custom Homes (12–24 months): Fully customized homes require additional time for design, permitting, and specialized construction work.

Step-by-Step Timeline & Process to Build a Custom Home
Building a custom home is a multi-phase process that requires careful planning, coordination, and execution. While the exact timeline can vary, a typical custom home build in Sacramento takes anywhere from 12 to 24 months from start to finish. Here’s what each stage involves and how long you can expect it to take.
Pre-Construction (4–8 Months)
Before construction begins, extensive planning is required to ensure the project runs smoothly.
- Initial Consultation & Estimate: Meet with a builder to discuss vision, budget, and feasibility.
- Custom Home Design Process: Work with an architect or designer to develop blueprints.
- Site Evaluation: Assess land conditions, zoning requirements, and utility access.
- Permitting & Approvals: Submit plans to the city and wait for approval, which can take weeks to months depending on complexity.
Site Preparation & Foundation (1–2 Months)
Once permits are in place, we prep your build site for the big show.
- Clearing & Grading: Remove trees, level the land, and prepare for utilities.
- Utility Hookups: Install water, sewer, and electrical connections if needed.
- Excavation & Foundation Work: Dig for a slab, crawl space, or basement foundation.
- Concrete Pour & Curing: Lay the foundation and allow it to properly set before framing begins.
Framing & Structural Work (1–3 Months)
This is when the home starts to take shape. This is getting exciting!
- Framing the Structure: Build the wooden framework, including walls and roof trusses.
- Sheathing & Weatherproofing: Install exterior sheathing and apply a moisture barrier.
- Roofing & Windows: Secure the home with roofing materials, doors, and windows.

Mechanical & Interior Work (3–6 Months)
With the structure in place, interior systems and finishes begin. This is often the most time-consuming construction phase due to multiple trades working simultaneously.
- Plumbing, Electrical & HVAC Installation: Run pipes, wiring, and ductwork before walls are sealed.
- Insulation & Drywall: Add insulation and cover walls with drywall.
- Flooring, Cabinets & Countertops: Install interior finishes based on design selections.
- Exterior Finishing: Complete siding, stucco, or brickwork on the outside.
Final Touches & Move-In (1–2 Months)
The finishing details and final inspections round out the end of the process.
- Painting, Fixtures & Trim Work: Apply paint, install lighting, and finalize trim details.
- Client Walkthrough & Punch List: Identify any final touch-ups or fixes needed.
- Final Inspections & Permits: Ensure the home meets all building codes before occupancy.
- Move-In & Closeout: Handover of the completed home and finalizing any warranty paperwork.

How to Stay on Schedule During a Custom Home Build
Here’s what homeowners and builders can do to ensure a smooth and timely build.
Work with an Experienced Builder Who Knows the Local Process
Not all builders are the same, and custom home projects require expert coordination. Choosing a contractor with experience in the Sacramento area ensures they understand local zoning laws, permit requirements, and the best suppliers and subcontractors to keep the project moving efficiently.
- Experienced builders anticipate potential delays and address them proactively.
- They have established relationships with suppliers and subcontractors, reducing scheduling conflicts.
- They navigate the Sacramento permitting process efficiently, avoiding common approval delays.
Plan and Finalize Material Selections Early
One of the most common causes of construction delays is waiting on materials. Custom homes often require specialty items like high-end cabinetry, imported stone, luxury flooring, or smart home systems, which can have long lead times.
- Make design selections early: Work with your builder and designer to finalize materials well in advance.
- Order critical items ahead of time: Some materials, like custom cabinetry and appliances, can take months to arrive.
- Be flexible with alternatives: If an item is back-ordered, having a second-choice option can keep things moving.
Maintain Clear Communication and Track Progress
Homeowners should expect regular updates from their builder to stay informed on progress and any potential challenges. At H&H Builds, we use BuilderTrend, a real-time project management platform, to keep clients up to date.
Best practices for communication
- Regular check-ins: Weekly or bi-weekly updates ensure you’re always informed.
- Use a shared project tracking system: Apps like BuilderTrend allow you to see progress, timelines, and pending tasks.
- Respond quickly to decisions: If a builder needs input on a material choice or layout adjustment, delays in decision-making can push back schedules.
Expect and Plan for the Unexpected
Even with the best planning, some delays are inevitable. Unforeseen weather disruptions, material shortages, or scheduling delays can add time to the project.
- Have a contingency buffer: Plan for some flexibility instead of expecting an exact move-in date.
- Address permitting and approvals early: Getting permits started as soon as possible prevents last-minute delays.
- Trust your builder’s experience: If they recommend adjustments to avoid a bottleneck, it’s usually in your best interest.
Secure Financing and Budget for the Full Project
Delays often happen when financing isn't finalized or unexpected costs arise. Ensuring that funds are available at each stage of construction prevents unnecessary pauses.
- Work with your lender early to secure construction financing and understand the draw schedule.
- Include a realistic budget for contingencies
- Make timely payments to keep subcontractors and suppliers on schedule.
Building Your Dream Home in Sacramento Starts Here
Designing and building a custom home in Sacramento is a rewarding journey, but it requires the right team to keep the process smooth and efficient. H&H Builds creates beautiful custom homes and remodels throughout Sacramento, Granite Bay, Folsom, Elk Grove, Rocklin, and surrounding areas. With expert project management, clear communication, and high-quality craftsmanship, we guide you through every step, so your dream home is built the right way, on time, and within budget.
Ready to start your custom home journey? Let’s talk about your vision. Contact us today for a consultation!